Design Proposal — 762 El Sombroso Drive, San Jose, CA
Tim McMullen
Tim McMullen
Designer & Project Consultant · DRE #02016832
762 El Sombroso Drive — Design Rendering
Backyard Transformation

762 El Sombroso Drive

San Jose, CA 95123
Designed: April 1, 2026
Scope: Backyard, Side Yard & Planter
$25,916.43
3D Design Renderings
Rendering — Backyard overview
Rendering — Paver path and turf
Rendering — Step stones and water feature area
Rendering — Planter and side gate path
Project Video Walkthrough
Current Condition
Current — Backyard overview
Backyard Overview
Current — Existing tan pavers and grass
Existing Pavers & Grass
Current — Garden section and planter beds
Garden Section & Planters
Current — Side yard and gate area
Side Yard & Gate
Project Scope
1
Demo & Removal
Remove wood-framed walls, wood fence, existing tan pavers, plant beds, bushes, and all debris. Pomegranate tree remains in place.
2
Excavation & Grading
Excavate to ICPI depth specs, grade yard for proper drainage, move excess rock to rear yard area.
3
Sod & Irrigation
Install new sod to cover former garden section, extend irrigation with new valve, sprinkler head, and 3/4" future utility pipe under baserock.
4
Paver Walkways
Belgard Holland pavers in Graphite — path from side gate through backyard, sloped away from house. Melville Edger in Anthracite creates a clean running border surrounding turf.
5
Step Stones & Water Feature Pad
3'×2' Belgard Dimension 24×36 Graphite DuraFusion stepping stones on compacted base, straight with curve pattern — surrounding the decorative water feature area.
6
Planter Bed Extension
Extend planter along fence in lower-left corner to side fence. 12"×12" concrete footings, pressure treated lumber boards — matching existing planter running length of yard.
Design Vision

This design reconfigures the backyard from a patchwork of aging tan pavers, overgrown planter beds, and fragmented grass areas into a clean, cohesive outdoor living space with clear zones for lawn, hardscape, and garden.

The existing garden section and planter beds are cleared and replaced with extended sod, giving the yard a consistent turf field that connects to the expanded irrigation system. A Belgard Holland paver path in Graphite runs from the side gate into the backyard, sloped away from the house for drainage, with a Melville Edger in Anthracite creating a sharp border around the turf perimeter.

At the focal point of the yard, 3'×2' Belgard Dimension 24×36 stepping stones in Graphite DuraFusion create a decorative pad surrounding the water feature area. The new planter bed extension along the lower fence mirrors the existing planters, completing the garden framework and tying the full yard together with architectural consistency.

Belgard Holland Graphite Path Melville Anthracite Edger Border 24×36 Step Stone Water Feature Pad Extended Sod & Irrigation Planter Bed Extension Full Demo & Regrade Future Utility Pipe Under Base Pomegranate Tree Preserved Slope Away from House
Materials & Specifications
Belgard Holland Stone Graphite
Classic Collection
Belgard Holland Stone
Graphite — 1-Piece Pattern
Tumbled texture, interlocking
3⅛" × 4¾" × 6⅜" × 2⅜"
Pattern Guide →   Spec Sheet →
Belgard Melville Edger Anthracite
Border & Edge System
Belgard Melville Edger
Anthracite — Concrete base set
Running border application
Trench excavated, concrete footing
Surrounds turf perimeter
Spec Sheet →
Belgard Dimensions Slab Graphite DuraFusion
Metropolitan Collection
Belgard Dimensions Slab
Graphite — DuraFusion™
Smooth face, crisp lines
24" × 36" × 2⅜"
Step stones, straight with curve pattern
Spec Sheet →
Paver Installation Cross-Section

ICPI certified · 8 engineered layers · 25-year workmanship warranty

8
Polymeric Sand
Fill gaps with polymeric sand, compact to lock pavers in place.
PAVERS
7
Pavers
Lay Holland Stone Graphite in interlocking pattern. Custom saw cuts along perimeter.
6
Bedding Sand
Screed 1" of angular bedding sand across compacted base.
BASE ROCK
5
Base Material
Additional 2" layer of Class II base rock, re-compact for stability.
4
Geo-Grid
Install geo-grid around perimeter so pavers move together as the earth moves.
BASE ROCK
3
Base Material
2" of Class II aggregate base, compacted for foundational stability.
2
Geotextile Fabric
Lay geo-tech fabric on compacted soil to assist drainage and prevent weeds.
EXISTING SUBGRADE
1
Native Soil
Excavate to required depth (7" pedestrian) and compact native soil.
8Engineered Layers
ICPISpecification Compliant
25 YrWorkmanship Warranty
Every square foot built to last — from subsoil to surface.
Why Bayside

DIY / Handyman

Low cost, high risk. No engineering, no warranty, no project management. You coordinate everything yourself — and hope for the best.

Bayside Pavers

One accountable team from design through completion. Licensed crews, ICPI-spec installation, project management oversight, and full warranty protection — on budget, on time.

Big Contractors

Higher overhead, longer timelines, multiple subcontractors. Your project competes with larger commercial jobs for attention and scheduling priority.

Warranties & Insurance
25 Years
Paver Workmanship
Covers all installed pavers — paths, pads, and borders — against installation defects including settling and breakage
1 Year
Planter & Sod Work
Covers structural planter construction and sod installation workmanship. Materials backed by manufacturer warranty
Full
Liability Insurance
Licensed crews, project management oversight, and comprehensive liability coverage throughout construction
Bayside Pavers

Bayside Pavers Installation Guide

Learn more about our process, standards, and what to expect on build day.

View Installation Guide
Investment Breakdown
Paver Walkways
Largest scope
Step Stones & Pad
Major element
Demo & Removal
Foundation work
Sod & Irrigation
Lawn & water
Planter Extension
Garden frame
Total Investment
$25,916.43
10% discount applied for cash/check payment
Next Steps
1

Review & Approve

Review this proposal and the design renderings. Ask any questions — we're happy to walk through every detail.

2

Sign & Deposit

Sign the agreement and submit the $1,000 deposit to secure your spot on the build calendar.

3

Scheduling

Construction begins within 3–6 weeks of contract approval, subject to material and crew availability.

4

Build & Walkthrough

Our crew stays on your job daily until completion. Final walkthrough ensures every detail meets your expectations.

Exclusions
  • Pomegranate tree to remain in place — not included in scope
  • Playground to be moved and placed back on grass area — not permanently relocated by Bayside
  • Client is responsible for water feature purchase and delivery — Bayside installs pad only
  • Plants, planting, and landscaping not included
  • 10% discount contingent upon payment via cash or check
  • Credit card payments subject to an additional 3% transaction fee
  • Down payment: $1,000 or 10% of contract price, whichever is less